RSS
热门关键字:
当前位置 :| Home>Policies and regulations>

Detail acceptance of work is normative

来源: 作者:Stand originally 时间:2008-12-29 Tag: 点击:


⑥ sticks the breed of face, line, color, decorative pattern to answer with facing board humorous is moved. The connect that stick a face should become 45° part, stick face and door window to cover board cover band to answer close together, level off, stick face or line to cover plasterer metope should not be less than 10mm.

The making installation of 11.3.2 wood curtain box of window should accord with following regulation:

Width of ① curtain box of window should accord with design requirement. When the design does not have a requirement, appropriate of curtain box of window extends the window two side 200 ~ 300mm, central line of curtain box of window should aim window central line, make two end extend window length identical. Ying Pingqi of the edge on the edge below curtain box of window and window or slightly low.

When ② should use craft of plywood of wooden keel double bag to make curtain box of window, the face stands to must not have the head of a nail of bright tenon, dew outside block fender, hemline should do sealing side processing.

Motherboard of ③ curtain box of window can use postposition to bury chock or expand bolt is fixed, block fender and ceiling hand over place appropriate to use horny line binding off. Curtain box of window relies on wall part to answer as clingy as metope.

④ curtain orbit is installed should flat, curtain course secures a dot to must be on the keel of motherboard, join must use wooden bolt, forbidden the hammer that use a circle is fixed. When using dynamoelectric curtain track, answer to undertake installing debugging by product manual.

The making installation of 11.3.3 fixed ambry should accord with following regulation:

① basis designs requirement and ground and ceiling elevation, determine the planar position of ambry and level.

When ② makes wooden frame, whole establishs a face to answer perpendicular, planar should level, frame has sex place should make tenon connection, should besmear brush carpentry emulsion.

Hammer of flat head of ③ side panel, motherboard, face plate application and frame are fixed and firm, the head of a nail should do anticorrosive processing.

④ drawer should use connection of swallow end tenon, drawer slippery course should be configured when installation.

⑤ hardware Ke Xianan holds take one's place, demolish its before paint, hardware install should orderly, firm.

The 11.3.4 armrest, making installation that protects column should accord with following regulation:

The connect of ① wood armrest and bend should join in bottom firm, when the width of wooden armrest or ply exceed 70mm, its connect should be stuck receive strengthen.

② armrest and perpendicular lever link is firm, fastener must not appear.

Sufficient feet model should be made before ③ whole bend is made, underline by example. When bend felt, temperature is unfavorable under 5 ℃ . Bend bottom should be united in wedlock with baluster flat steel close together, firm.
最新评论共有 0 位网友发表了评论
发表评论
评论内容:不能超过250字,需审核,请自觉遵守互联网相关政策法规。
用户名: 密码:
匿名?
注册